Menu

DIN 18381 PDF

0 Comments

DIN German construction contract procedures (VOB) – Part C: General technical specifications in construction contracts (ATV) – Installation of gas. Buy DIN GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) – PART C: GENERAL TECHNICAL SPECIFICATIONS. Buy DIN E: GERMAN CONSTRUCTION CONTRACT PROCEDURES (VOB) – PART C: GENERAL TECHNICAL SPECIFICATIONS.

Author: Malasar Vusho
Country: Botswana
Language: English (Spanish)
Genre: Relationship
Published (Last): 5 March 2017
Pages: 127
PDF File Size: 10.47 Mb
ePub File Size: 12.50 Mb
ISBN: 237-2-95606-493-1
Downloads: 2471
Price: Free* [*Free Regsitration Required]
Uploader: Daim

Greco-australieni

We have no amendments or corrections for this standard. Already Subscribed to this document. This standard is not included in any packages.

BA approximately July Completion complete measure around the end of the th. If the document is revised or amended, you will be notified by email.

Keyword Title Author Topic. No portion of this article can be reproduced without the express written permission from the copyright holder. Proceed to Checkout Continue Shopping.

Mar 21, Words: As part of the renovation and modernization project Central OP and kitchen is the advertised here measure Central – OP conducted in 3 phases.

  CHICO BUARQUE SONGBOOK VOLUME 4 PDF

Brothers of charity hospital trier, reconstruction and modernization of central op and kitchen, central area – op; here: The construction project is located in the grounds of the Hospital of the Hospitaller Brothers of Trier in Trier, directly between existing buildings and parts of buildings.

Please first verify your email before subscribing to alerts. Please first log in with a verified email before subscribing to alerts. As the voice of the U.

Retrieved Dec 31 from https: Standards Subscriptions from ANSI provides a money-saving, multi-user solution for accessing standards. Standards Subsctiption may be the perfect solution.

Gas-, Wasser- und Entwässerungsanlagen DIN

Metalwork and steel doors. Add to Alert PDF. Subscription pricing is determined by: Deposits and Guarantees required: You can download and open this file to your own computer but DRM prevents opening this file on another computer, including a networked server.

Your Alert Profile lists the documents that will be monitored. Sanitary system consisting of DIN about 8 pcs OP-series washes with fittings90 pcs Sanitary fittingsabout 2 pcs dry fire water systems pcs sanitary fittingsapproximately 3, djn meters irrigation 1831 made of stainless steelapproximately 1, linear meters drainage pipes made of cast ironabout 1 pcs soft water and reverse osmosis unitBeginning Installations 1. You may delete a document from your Alert Profile at any time. It should be completed sanitary procedures below in a total of 3 stages.

  FARMACOS ANTIANGINOSOS PDF

– C – circuit breaker – CN – 1P – A – D curve | Schneider Electri

The document specifies the general technical conditions of contract which have to be fulfilled in Installation of gas, water and drainage pipework inside buildings with regard to materials, execution of work, associated and special tasks and the settlement of accounts. Need more than one copy?

This standard is also available to be included in Standards Subscriptions.